Project Washington:
An Economic Game Changer for Delaware and New Castle County
An investment in New Castle County that will generate nearly $10 billion in economic output, $75 million in tax revenue per year, 3,500 local construction jobs, and 700 high paying permanent positions, transforming the County into a hub for innovation, infrastructure, and opportunity.
A Next Generation Data Center Campus
Project Washington is a next-generation data center campus designed to strengthen Delaware’s economy, create good-paying jobs, and responsibly power the technology that connects our world. With nearly $10 billion in economic output during construction, 3,500 construction jobs, and 700 permanent positions with an average salary of over $100,000, the Project represents an unprecedented win for Delaware’s future.
Designed for the Community
No disturbance to wetlands or wildlife.
Thoughtful landscaping and visual buffers.
Modern architecture integrated with the surrounding environment.
A Thoughtfully Designed Data Center Campus
- The south parcel, Phase I, is zoned Heavy Industrial. Data center is allowed as a permitted use in Heavy Industrial.
- The north parcel, Phase II, is zoned Suburban. It is currently undergoing rezoning to Industrial. Note, the north parcel is currently designated as “Business Flex” in New Castle County’s 2050 Comprehensive Development Plan. Data center use aligns with the “Business Flex” designation.
The site sits within an existing industrial corridor, buffered by major transportation infrastructure, and includes 40% preserved open space, which is twice what code requires. All dedicated onsite electrical infrastructure will be onsite and privately fundedpaid for by the developer, leveraging the existing 500kV transmission line that bisects the site to minimize public infrastructure upgrades and costs.

